ConsultJR Assists Brimar With Port of Brisbane Power Systems Analysis Study

ConsultJR performed power system analyses and arc flash assessments for 26 LV switchboards across six sites at Port of Brisbane for the asset owners, Port of Brisbane Pty Ltd. The scope required attendance on site by our electrical engineer to audit the switchboards to assess their condition and to obtain the detailed technical data necessary for the power system modelling exercise.

Scope of Works included:

  • Switchboard site audits and interface with Brimar as the site electrician
  • Modelling of the power system for each installation using PowerTools for Windows
  • Completing Load Flow, Voltage Drop, Fault Current, Protection Coordination, Maximum Demand, Arc Flash and LV Power Cable Sizing studies for each installation

Project highlights:

  • Six sites comprising 26 LV switchboards were assessed and modelled
  • Site audit responsibility
  • Comprehensive power system analysis reports provided for each site

Project Details:

  • Location: Port Of Brisbane
  • Client: Port of Brisbane Pty Ltd
  • Duration: Dec 2019 – June 2020